Volkswagen Paint Shop

7173 Discovery Drive
Chattanooga, TN 37416

668,952 Square Feet
4310 Tons of Structural Steel

Furnish and Erect

Years: January 2009-January 2010

SSOE, Inc.

Original Erection Duration – 20 Weeks
Final Erection Duration – 20 Weeks

Volkswagen of America
2200 Ferdinand Porsche Drive
Herndon, VA 20171

volksagen

This 668,952 square foot facility was awarded on an design assist basis in December 2008. The project consisted of long span wide flange/angle truss framing and composite beam floor framing. We commenced erection in March of 2009 and completed erection in July 2009. The schedule was maintained even though there were major design changes throughout the entire project.