New Campus East Main Office Bldg and Central Utility Plant

7152 Heller Loop
Springfield, VA 22510

2,236,000 Square Feet
23,000 Tons of Structural Steel

Furnish and Erect

Years: August, 2009-December, 2010

RTKL/Kling Stubbins

Original Erection Duration – 52 Weeks
Final Erection Duration – 50 Weeks

United States of America, C/O USAED – Baltimore
10 South Howard Street
Baltimore, MD 21201-1715

new-campus

The New Campus East project includes a 2.2 million square foot Main Office Building and a 136,000 square foot Central Utility Plant. Both structures were designed using the Integrated Design-Bid-Build method managed by the US Army Corps of Engineers. This method allowed for strong collaboration between SteelFab and the design team throughout design and construction. This was critical to achieving and maintaining the tight schedule requirements while still accommodating numerous owner driven design changes. The project also required full bonding, which SteelFab was able to provide.

Related Projects

Start typing and press Enter to search